Transportation Dreams submissions

In December of last year, I submitted two maps to the Boston Public Library’s Norman B. Leventhal Map & Education Center’s Transportation Dreams contest. The first is entitled “Project Electric Sheep,” and the second is “Project Gold Line.”

I’m a firm believer in dual creative processes — “campaign in poetry, govern in prose,” “write drunk, edit sober” (in the metaphorical sense), creation and refinement. These two maps present a similar duality: one is wider-ranging in its creativity; the other is a refinement into a focused proposal.

I do want to emphasize that, even on the creative map, all proposals are grounded in examinations of feasibility, cost-effectiveness, and efficiency. These are indeed “transportation dreams”, but they absolutely could be realities.

(I am told these and the other submissions will be on display at the BPL through the end of February!)

“Project Electric Sheep” — a feasible yet fun “crayon map”

This is the statement accompanying my submission:

This map has been perhaps a decade or more in the making. Drawing heavily on discussions I’ve participated in on ArchBoston, I have sought to generate a vision for Boston transit that is both inspiring and feasible. 

This design adds over 44 miles of rail to the T’s existing network, only about 9 miles of which would require new tunneling. By focusing on existing infrastructure, extant ROWs, and opportunities for low-cost construction (such as wide streets and areas with well-mapped geologies), we can achieve a radical increase in transit access across the region. 

My proposals are built on data from a range of sources, including: 

I have also drawn on the qualitative experiences of myself and other T riders. 

This map would not have been possible without the years of collaborative discussion at ArchBoston. Much of my thought process in developing this map is documented there, and some proposals are also documented on my website (ever a work in progress).

A small number of stations have been renamed on this map, for ease of wayfinding and to celebrate a fuller array of figures from Boston’s rich history.

This diagram includes the “Gold Line,” an articulation of a long-discussed idea on ArchBoston, which is presented in greater detail in my second submission (below) and here on my website.

Additional details on the various proposals in Project Electric Sheep can be found in the appendix to this post.

(The submitted map had the Bronze Line J service terminating at West Station rather than Boston Landing. Further details in the appendix. The submitted map also had the labels for Edgeworth, River’s Edge, and Wellington in incorrect order, which I have fixed here.)

This diagram is, in some ways, meant to be “fun” (in a way that crayon maps are supposed to be). There isn’t a specific date tied to this map, and it neither represents a “preferred build” nor a “full build” nor a “must build”. Rather, it’s a vision of one possible future.

Project Gold Line

This is the statement accompanying my submission:

Like my other submission, this map has also been long in the making. 

Over the last decade, an ongoing discussion on ArchBoston has examined ways to remake the Green Line into a better version of itself. These discussions have been wide-ranging, at times ruthless in pragmatism, and equally unbound in imagination.

Only in the last couple of years has a consensus emerged on certain key pieces of this “Green Line Reconfiguration”. I myself have struggled to find a way to articulate the possibilities afforded by these (relatively mundane and unflashy) key pieces. 

Which brings us to: the Gold Line. The “Gold Line” concept seeks to pithily capture the key projects needed to unlock the system’s full potential:

  • Reroute the E Line via Back Bay to utilize the unused Tremont St Subway
  • Extend the E Line’s subway west down Huntington, at least to Brigham Circle
  • Construct a short subway to South Station and run trains through the Silver Line tunnel, linking the Seaport, Downtown, Back Bay, and Longwood

There are additional components beyond these, including connecting the D and E Lines to create a full-length rapid transit line, as well as extending the Green Line to Nubian Square, but the three investments listed above would, in tandem, be transformative.

Particular data sources include:

Beyond ArchBoston, some of these proposals are also documented on my website (ever a work in progress).

Additional details on the Gold Line concept are available here on my website.

~~~

Teban54Transit also submitted a map to Transportation Dreams detailing the Green Line Reconfiguration concept. He and I corresponded while creating our maps and we decided to intentionally pursue different approaches. My Gold Line map focuses on a set of core components, while Project Electric Sheep shows the Gold Line in a systemwide context with other extensions, such as a Bronze Line through Kendall; his map falls in between, showing a larger and more detailed view of the expansions to the existing Green Line that become possible through the Green Line Reconfiguration. Our maps have some differences, which intentionally demonstrates the flexibility of the improvements we propose.

Siting an Urban Ring LRT station in the Seaport (and the general challenges of using Track 61 for rapid transit to the Seaport)

The following is purely a fun exercise for a highly hypothetical scenario. I’m posting it more as an illustration of thought process, and not really in advocacy of the proposal itself. (There are many things I would prioritize above an Urban Ring LRT station in the Seaport!)

The scenario

Let’s assume a few things are true for this scenario:

  • The Piers Transitway (currently serving SL1, SL2, and SL3) is converted to light rail and connected to the larger light rail network via a subway running from Huntington Ave to Back Bay to South Station — we’ll call this the “Magenta Line”
    • “T-under-D” has been completed, meaning the subway now extends from World Trade Center station under the current grade crossing at D St to a portal near the current Silver Line Way station
  • Center-running bus lanes on Congress St in downtown and Summer Street in the Seaport have been built, and the T7 upgraded into a full bus rapid transit service, which we’ll call the “Navy Line”
  • SL1 service has been transferred to the Navy Line, to provide a one-seat ride connecting North Station, the Financial District, South Station, the Seaport, and the Airport
    • We’ll loosely assume that a lane in each direction of the Ted Williams Tunnel has been dedicated to mass transit use
  • An LRT iteration of the Urban Ring has been built on the southside of the network, connecting Longwood, Nubian, and the Seaport, approaching the Seaport via the Track 61/South Boston Haul Road ROW

In short, our starting point looks like this:

The satellite image doesn’t tell us the whole story, however. This is a highly three-dimensional space, where Summer St and World Trade Center Ave sit elevated above the rest of the street grid, and where a slew of highway tunnels sit under the surface.

World Trade Center Ave looking east, as seen from Summer St
World Trade Center Ave from above, looking north, with Haul Road below and to the right
World Trade Center Ave at “elevated street level” looking north, from nearly the same vantage point as above, but lower down
Track 61 and Haul Road passing underneath Summer St, from above World Trade Center Ave, looking west; the Boston Convention and Exhibition Center is visible at the far left
OpenStreetMap showing the tunnels below the surface

Where to place an Urban Ring LRT station?

“The gravel pile”

As visible in the photo above looking west along Summer St, there is a triangular plot of land bounded by Track 61, the embankment of Summer St, and (effectively) the elevated WTC Ave. (There’s actually an access road that cuts off the corner of the plot slightly east of WTC Ave.) That plot currently is occupied by a massive pile of gravel. (Last I checked, the plot is owned by MassPort, though I assume they would sell it off to a developer if/when they could.)

This is probably the most obvious place to plop down an LRT platform. It’s accessible from the current ROW with minimal modification and landtaking required; it provides good access to BCEC and easy transfer to the Navy Line services (including services to the airport); the Magenta Line subway station at World Trade Center is about 400′ away, which isn’t ideal but is certainly manageable, especially if one of the sidewalks can be covered for protection from the elements.

There are some downsides. The plot is a little small; if we leave the access road untouched, it’s just about 230′ along the long edge, which would be barely long enough for a double-set of the 114′ Type 10 “supertrains” that are expected on the Green Line in the next several years. So it’s likely the modifications at the east end, west end, or both would be needed to fit a center platform, two side tracks and a crossover. (Depending on how the Track 61 ROW is converted to double track LRT, some space might already be reclaimed from Haul Road at the western end, which might simplify the design somewhat.)

The other downside is that this location serves the Seaport, but only somewhat so. A lot of the Seaport is located on the other side of the “highway canyon” that Track 61 and Haul Road sit within, so Urban Ring passengers would need to go “up-and-over” for the last segment of their journey. The current World Trade Center station is much more centrally located.

The gravel pile is potentially an adequate location for a station, and would likely be the least expensive option. On the other hand, if we are going to go to the expense of building an LRT Urban Ring, there’s an argument that it should be built for maximum efficacy, rather than just minimal cost.

The underground parking lots

As can be seen in the photos, there are a number of parking lots at the grade level of Track 61, including one parking lot that directly abuts the southern wall of the current World Trade Center station; open that wall up, and you have a strong transfer to the Magenta Line.

The problem here is that you need to cut across Haul Road and the Mass Pike ramps in order to access the lot. And while that’s doable, it’s far from ideal. There actually already is a traffic light directly underneath WTC Ave on Haul Road, so in theory the disruption to traffic flow would not be new. On the other hand, you could only run trains so often if they need to disrupt traffic, probably capping headways at 5 minutes. Again, that is doable, but seems to trigger the same question as above — if we’re gonna build this thing, why not do it properly?

World Trade Center Ave

One thing that bothered me when thinking about mini-project was how to provide good transfers to both Summer St BRT and Transitway LRT. The distance between a stop in front of BCEC and the entrance to WTC station is roughly 650′, which is long for a transfer but not unheard of. (If I recall correctly, it’s roughly the distance of the transfer between Southbound Orange and Blue at State. Of course, State has the benefit of being entirely indoors, while BCEC <> WTC would have significant exposure to the elements, even if the sidewalk were covered.)

Having two Urban Ring stations — one for the Transitway and one for Summer St — seemed excessive. So then I got to thinking more about what the objectives are for stations/connections at each location.

Summer St

  • Boston Convention and Exhibition Center
  • Transfer to Summer St BRT toward downtown: South Station, Post Office Square, Haymarket, North Station
  • Transfer to Summer St BRT toward Logan
  • Transfer to Summer St BRT toward South Boston

Transitway (World Trade Center)

  • Seaport core, including Congress St and Seaport Boulevard
  • Transfer to Magenta Line westbound: western Seaport, South Station, Back Bay, Longwood
  • Transfer to Magenta Line eastbound: eastern Seaport

On paper, that looks like a lot of reasons for each, and maybe even more in favor of Summer St due to its connectivity, but when you look closer, some are less relevant:

Summer St

  • Boston Convention and Exhibition Center
  • Transfer to Summer St BRT toward downtown: South Station, Post Office Square, Haymarket, North Station
    • By definition, the Urban Ring will have multiple connections to downtown, so this is not a vital benefit
    • Also, Urban Ring riders will all but certainly be coming from locations that already have direct service to downtown — it’ll be a very uncommon journey to transfer in the Seaport
  • Transfer to Summer St BRT toward Logan
    • As you’ll see below, this benefit is in fact not going to be unique to Summer St
  • Transfer to Summer St BRT toward South Boston
    • I won’t put strikethrough on this one, but I will point out that most of the previous connection points along the Urban Ring corridor (e.g. Broadway, Mass Ave/BU Medical Center, Nubian) will hopefully have — and will be better served anyway — by direct bus service from South Boston
    • Again, the Seaport itself wouldn’t be a common transfer point

Transitway (World Trade Center)

  • Seaport core, including Congress St and Seaport Boulevard
  • Transfer to Magenta Line westbound: western Seaport, South Station, Back Bay, Longwood
    • As mentioned above, pretty much all of the Urban Ring stops between Nubian and the Seaport will have better ways to connect to South Station, Back Bay, and Longwood than via the Seaport
  • Transfer to Magenta Line eastbound: eastern Seaport

So, to me, the goal of an Urban Ring LRT station would be twofold: connect to the Seaport, and connect to Logan. A stop anchored by the Transitway station better serves the Seaport and, as you will shortly see, also serves Logan. So, insofar as we need to choose which connection to prioritize, we should focus on a Magenta Line connection at World Trade Center station.

Getting to Logan

In some alternate timeline, the Ted Williams Tunnel was built with a third tunnel to carry rapid transit rail service to Logan. This would’ve been so much better than today’s system, but alas.

In the scenario I’ve outlined here (and, in my opinion, in any vaguely realistic scenario), service to Logan is provided by BRT. Now, to be clear, BRT can be a lot better than what we have today. For one, a lane in each tunnel could be dedicated to transit and perhaps very-high-occupancy vehicles, with semi-permanent lane protection to ensure speedy and unencumbered journeys.

But our BRT services still need to get in to the tunnel, and the solution to that problem also solves the problem of Summer St vs the Transitway.

Today’s SL1 and SL3 services make a semi-unadvertised stop at street level on Congress St just outside of World Trade Center station; they do this immediately after exiting the off-ramp, which has the benefit of getting travelers from Logan to a stop in the Seaport quickly, without needing to double back from Silver Line Way.

This stop is marked on my diagram from the top of the post (though I am supposing that the simple sidewalk stop has been expanded into something more like a proper BRT platform):

As far as I can tell, absent a major rework of the Mass Pike tunnels, Logan-originating buses will exit from that off-ramp for the foreseeable future. Now, it is true that Logan buses could instead turn left and use Congress St bus lanes to head toward downtown. However, that would duplicate the lanes on Summer St which would still be needed for South Boston service (i.e. the T7), and would be more awkward to connect to South Station. And while Logan -> South Station is mildly more direct via Congress, the journey in the opposite direction is significantly worse, requiring a lengthy diversion down Haul Road in order to reach the on-ramp.

Funneling Downtown <> Logan service through Summer St maximizes frequencies on the shared trunk, minimizes redundant infrastructure, and maintains good Logan -> World Trade Center service. It is somewhat more roundabout, but connects to more places. (And if we are really worried about an express South Station <> Logan connection, using dedicated lanes in the Mass Pike tunnel running direct into the South Station Bus Terminal is probably a stronger solution anyway.)

So we’ve identified a way for our Logan -> South Station service to transfer at WTC station, but what about the other direction? Well, that’s where those parking garages can come in handy.

Running directly parallel to the Transitway is a small side street/alley that runs into the lower level of the parking garage, and which, I think exits on to Haul Road just underneath World Trade Center Ave. Visible in the second Streetview photo are two large metal doors: I am pretty sure that those lead directly into the lobby of the World Trade Center station — meaning that with some modifications, you could put a BRT platform near there, and have buses immediately proceed to the on-ramp.

This would then provide a strong transfer point to Logan-bound services at World Trade Center proper — benefitting Magenta Line riders, but also providing a crucial transfer point enabling an Urban Ring station at World Trade Center.

Placing an Urban Ring LRT station at World Trade Center

So, where to put a new LRT station at World Trade Center?

We can’t put it at grade level without disrupting all the highway ramps, or otherwise settling for a station at Summer St instead.

We can’t put it below grade level because of the highway tunnels.

What about above grade along the World Trade Center viaduct?

Building a short rising viaduct on the gravel pile’s plot and claiming some of World Trade Center Ave (more details on that below) to add a above-grade LRT platform, combined with building an at-grade BRT platform for Downtown -> Logan services by reclaiming some space under the parking garage and adding a BRT platform on Congress St for Logan -> Downtown service, enables all three services to be centralized in a single station for easy transfers between all three.

So how do you reach the World Trade Center Ave viaduct?

Some of this will depend on how Haul Road is reconfigured for double-track LRT, particularly in terms of the horizontal alignment (do you steal a lane, or eat into the gravel pile?), but I think there’s enough open space to feel comfortable that something could fit, even if we don’t work out the details right now.

One area we have less flexibility on is the vertical alignment: there’s approximately 310 feet of horizontal running space between the Summer St underpass and the edge of the World Trade Center Ave viaduct, and we have to fit our rising viaduct in there.

The WTC Ave viaduct is approximately 25 feet high; 25 feet rise over 310 feet run yields a grade of 4.61°, which is well within the comfort zone for LRT grades. Even a rise of 33 feet over that distance would still come in at our 6° threshold. Likewise, rising 25 feet at <6° is doable in as little as 240 feet. Therefore, even with the known limits, it should be possible to rise from the Summer St underpass to the World Trade Center Ave viaduct at a reasonable grade.

Fitting a terminal on the World Trade Center Ave viaduct

The main question facing us here is whether to maintain some level of automobile access through WTC Ave. I believe I’ve come across proposals to fully pedestrianize that street, which, honestly, based on my experience, seems pretty reasonable. Mostly it seems like the street is used to deliver goods to the World Trade Center proper.

If I needed to maintain some level of automobile access, I would use a staggered pair of side platforms to maintain LRT capacity and keep a shared bidirectional lane open for vehicles to pass through on a limited as-needed basis, placing signals/traffic lights at each entry to coordinate passes through the right-of-way.

Obviously, this arrangement is complicated and would create some disruption to the system, depending on the road traffic volume. This option would need to be considered carefully to assess the cost vs benefit.

The key thing to note is that there is horizontal space to fit all the necessary elements:

  • First 230′ platform (enough to accommodate a doubleset of the 114′ Type 10 supertrains)
  • 90′ to fit a crossover to provide passing access
  • Second 230′ platform
  • A 100′ radius curve from the rising viaduct on to WTC Ave
  • Reasonably short walking distance between platform and current headhouse to streamline transfers
  • Maintain pedestrian access to the elevated greenspace between Congress St and Seaport Blvd

The second option is more conventional and straightforward: pedestrianize the whole viaduct, and claim part of it for a GLX-style center-platform terminal station.

There are lots of potential variations on this design — adjusting the width, length, and placement of the platform, trying out different methods of pedestrian access — but they all more-or-less look like this.

Keen observers will note that none of these designs feature fare gates or paid-access vs unpaid-access areas. Numerous transit systems, both in the US and around the world, have demonstrated that it is possible to run ticketed transit systems that do not require metal barriers to enforce payment. Eliminating fare gates makes it possible to build transit access more directly into the fabric of a neighborhood. Both station designs, but particularly the staggered platforms alternative, see no clear demarcation of the “edge” of the station, but rather allow the space to be woven together into a seamless whole.

So how do you site an Urban Ring LRT station in the Seaport?

To me, it looks like this:

  • Add a BRT platform at World Trade Center station for Downtown -> Logan services (under the parking garage just south of the station)
  • Build a viaduct to connect Track 61 LRT to the WTC Ave viaduct
  • Add an LRT station at-grade on the elevated World Trade Center Ave viaduct

Should you put an Urban Ring LRT station in the Seaport?

One thing this exercise illustrates is that the Seaport is not very wide. This sounds obvious and trivial, but one result is that there isn’t really space nor need for a “crosstown” service. The Piers Transitway and Summer St already form strong “east-west” transit corridors (whose elevation difference reduces their overlapping walksheds slightly). But they’re still close enough that a perpendicular service between/across them wouldn’t make much sense (particularly since both originate at South Station and come very close to connecting again at World Trade Center).

So a Track 61 LRT service basically needs to choose a particular point along the “linear Seaport corridor” to terminate. That increases the pressure on that station to be located optimally to maximize access to jobs as well as to transfers. World Trade Center does reasonably well on that front, but both the eastern Seaport (e.g. Design Center) and western Seaport (e.g. Courthouse) would require transfers for short last-mile journeys. But this need to choose lies at the heart of why siting an Urban Ring LRT station in the Seaport is difficult in the first place.

A Track 61 LRT service will likely reach the Seaport in part by passing near Broadway station. Regardless of origin point beyond there, a service near Broadway likely could instead be aligned to pass through South Station instead — and then continue to Seaport along one of the east-west corridors. (For reasons I won’t get into here, a Piers Transitway LRT corridor would very likely have excess capacity to absorb Urban Ring LRT in addition to the Magenta Line LRT I’ve described here.)

Sending an “Urban Ring” LRT service down one of the east-west corridors would provide better access to the entire Seaport, and reduce/eliminate the need for transfers. Running LRT service via Track 61 may in fact be unnecessary.

This brings us to a key difference between an LRT Urban Ring and a BRT one: BRT can continue to Logan Airport and on to Chelsea much more easily than LRT. Rapid transit on the Track 61 ROW, with a transfer station roughly at World Trade Center, and continuing service to Logan is able to catch a much broader swath of journeys (in italics below), compared to service terminating in the Seaport:

  • Longwood <> Seaport
  • Nubian <> Seaport
  • Red Line transfer point TBD (e.g. Broadway) <> Seaport
  • Longwood <> Logan
  • Nubian <> Logan
  • Red Line transfer <> Logan
  • Longwood <> Chelsea
  • Nubian <> Chelsea
  • Red Line transfer <> Chelsea
  • Seaport <> Chelsea
  • Logan <> Chelsea

The concept of the Urban Ring was to provide circumferential service that bypasses downtown, for speedier journeys and reduced crowding in the core. A route that terminates at Seaport curtails possible destination pairs, and becomes less competitive against transferring downtown via the radial services (especially for long circumferential journeys).

Returning to the point about connecting at Broadway vs South Station: South Station is, to be clear, the bigger fish. Nubian <> South Station journeys surely outnumber Nubian <> Broadway journeys. Urban Ring concepts usually favor a transfer at Broadway or to the south — but can justify skipping South Station because they are providing speedier service to Logan and Chelsea. Track 61 LRT can’t do that.

So I think Urban Ring LRT service via Track 61 presents a weaker case than it first appears. Now, it bears mentioning that capital costs for a Track 61 LRT route would probably be less expensive than a journey via South Station. If given the choice between Track 61 LRT and nothing, I’ll be entirely in favor of the former.

Conclusion

Ultimately, this is a fun thought exercise. The scenario I’ve contrived here presupposes a lot of things, so its “real-world relevance” is somewhat limited. A few final thoughts:

  • The problems I’ve outlined here will impact any Track 61 proposal; Track 61 will always be on the wrong side of the Mass Pike between Summer and Congress Streets, so you’ll always need to figure out a way to bridge that gap
  • This conversation becomes radically different if an LRT connection between Seaport and Logan is built — although even then, Track 61 will still be on the wrong side relative to the Transitway
  • Urban Ring considerations aside, I’d suggest that a Navy Line service to Logan would significantly benefit from the “under-the-garage” platform I propose here, especially if the Transitway is converted to LRT and thus cut off from Logan
  • The Seaport is centered on two east-west corridors, and there’s an argument to make that almost all services, even circumferential ones, would do well to feed into or otherwise align with those

For all the reasons outlined here, and others, most of my crayon maps going forward will favor both LRT and BRT Urban Ring services that run via South Station, rather than Track 61/Haul Road. At most, I can see Haul Road being useful for express service to Logan that bypasses the Seaport — that, it could do quite well. But for serving the Seaport proper, I think it comes up short.

Inevitabilities in Life: Death, taxes, and decreased frequencies on branches

In my previous post about branches, I briefly discussed the rapid decrease in frequencies as you add more branches to a trunk line. You might remember a diagram that I showed: 

A service level diagram, where the trunk has 15 tph, and then 5 tph branch off, leaving only 10 tph to the next station, after which the line splits into two branches of 5 tph each

In this diagram, the trunkline sees high-frequency headways of 4 minutes (which is better than many subway lines in North America). With such a high frequency, it’s easy to think that there’d be enough trains to serve a bunch of branches.

But as you can see, four-minute headways equals 15 trains per hour. If you have three branches, that means each branch gets 5 trains per hour – which yields 12 minute headways. If these branches are out in suburbia, 12 minute headways might be appropriate, but you’ve nearly reached the limit. If you were to add a fourth branch, each branch would see less than 4 trains per hour, at 16 minute headways, at which point you really no longer have a claim to “frequent service”.

In my last post, I recommended, as a rule of thumb, no more than two branches per line. However, I didn’t explain why. It comes down to a combination of typical throughput capacities, and mathematical inevitabilities. 

Divvying up trains-per-hour among multiple branches

Consider this chart:

I will post a text version of this table in the next few days!

On the left side, we have a list of potential trunkline capacities, measured in trains per hour. These indicate how many trains in each direction you can squeeze through your trunkline in an hour. (Don’t worry about converting these numbers to headways – I’ll get to that below.) 

For some perspective (most numbers pre-covid): 

  • BART ran 16 tph through its core section from Daly City to West Oakland
  • CTA ran between 12 and 20 tph on its Red and Blue Lines during peak
  • WMATA ran 15 tph on its Red Line during peak
  • MBTA ran 15 tph on its Red Line during peak
  • London Underground’s throughputs vary widely from line to line, with some lines seeing over 30 trains per hour, following major infrastructure and modernization improvements
  • Beijing’s subway runs between 30 and 35 tph on several of its routes
  • Shanghai’s subway runs between 15 and 32 tph on most of its inner routes

All of which is to say, the top few rows represent trunkline capacities that require major investment in transportation infrastructure.

To the right of those trunkline capacities are the number of trains available to each branch, depending on how many branches you have. So, for example, in the first row, a 40 tph trunk will provide 20 tph to two branches, 13.3 tph to three branches, 10 tph to four branches, and so on. 

As mentioned before: you’ll notice that, as you move from left to right across the chart, the numbers in each row drop dramatically. In fact, the decrease is literally exponential; you can describe the chart above using

y = n-x

where n is the capacity of your trunkline in tph, x is the number of branches, and y is the resulting tph per branch.

Decreasing frequencies due to decreasing tph

It’s helpful to start this discussion using tph as a measure, because it’s easier to recognize the patterns in the numbers’ decrease. However, once we convert those tph into headways, it’ll become that much clearer why branching quickly leads to decreased frequencies.

I will post a text version of this table in the next few days!

I’ve added some (opinionated) color-coding, meant to suggest the various “levels” of service these different frequencies provide. 

  • The bright green (every 5 minutes or better) represent the highest tier of frequent service an agency might provide. “Turn up and go.”
  • The pale green (every 5-10 minutes) are still comfortably in the realm of rapid transit, but are probably better suited to off-peak periods and lower-ridership networks. “Turn up and wait a couple minutes and go.”
  • The yellow (every 10-15 minutes) are the lowest tier of what could be considered “turn-up-and-go,” describing services where riders don’t need to check a schedule when planning journeys. Call this tier “turn up and wait.”
    • This tier should be approached cautiously, with careful attention paid to the specific corridor where these frequencies would be deployed.
    • (Sadly, consideration should also be given to reliability; if a bus is scheduled to show up every 13 minutes, but one run gets dropped, suddenly you have folks waiting nearly a half-hour for their bus.)
  • The subsequent tiers are rarely going to be considered “frequent service”; some could be “salvaged” by adhering to a strict clockfacing schedule: a route that reliably comes exactly :13 minutes and :43 minutes past the hour can be a useful service that isn’t “turn-up-and-go”, but doesn’t require consulting a schedule either. These tiers break down something like this:
    • Orange = “plan when to leave, but journey whenever”
    • Light grey = “plan when to journey”
    • Dark grey = “schedule around the schedule” 

As you can see, our frequencies drop through the tiers I’ve described above quite quickly. Once you hit the yellow tier, you’re teetering on the edge of frequent service, and once you hit the orange and beyond, you’re definitely over the edge.

Different regions will have different definitions of “high frequency”. For example, it’s pretty rare to wait more than 4 minutes for a tube train in central London; a six-minute headway would be considered sub-par. In Boston, we are sadly accustomed to six-minute peak headways on the Orange Line, while Baltimore’s subway sees peak service every 8 minutes. 

It’s worth highlighting that reaching 90-second headways at 40 tph on heavy rail is exceptionally difficult. If you have multiple tracks in the same direction, it becomes more manageable, but a standard two-track subway is nearly impossible to operate at 40 tph per direction, outside of the world’s most advanced subway systems. And notice – even the top examples I listed above, such as Beijing or London, you’re still looking at that second row as your baseline, at around 30 tph. Even in those systems, having more than two branches knocks each branch down into a lower “tier”, meaning it’s not suitable to do within the urban core. 

If your crayon map requires shoveling 40 trains per hour through a trunk line, then probably it’s worth trying to plan a second trunk line!

Gaming out examples, and dealing with the unideal real world

Many of the North American systems I mentioned above see 4 minute headways on their core. If we go to that row, we can see two branches gives us 8 min (good so far), three branches gives us 12 min (borderline), and four branches gives us 16 min (no good). 

Some North American systems see base headways of 7 or 8 minutes. In that case, our drop-off happens even faster: 2 branches becomes borderline, and 3 branches sinks us with headways longer than 20 minutes.

On the London and Chinese systems mentioned above, trunklines see headways around 2 minutes or better. In theory, those trunklines could accommodate five or six branches; but if you drop the core headways by just one minute, suddenly you can only accommodate three or four branches at similar frequencies. 

And that “in theory” caveat is what’s really going to get us. Even if you can squeeze 30 tph through your trunkline to get 2-min headways, if you are feeding that trunk from five branches, that’s five times as many opportunities for delays and disruptions. We just saw above that the difference between a 2-min headway and a 3-min headway is worth two whole branches of throughput. That’s a very thin margin for error – meaning that you need reliability to be extremely high, or else the whole system will unravel, with cascading delays across your network.

The exceptions that prove the rule: North American legacy subway-streetcar networks

There are only two networks that I’m aware of which see sub-10 minute headways on four or more branches, feeding into a trunkline handling 40 tph: the MBTA’s Green Line and SEPTA’s Subway-Surface Lines.

This level of throughput is achieved (see caveat below) mostly because they are light rail lines rather than heavy rail. This means shorter trains which can start and stop faster, and therefore can be run closer together (albeit at lower speeds). The MBTA allows multiple Green Line trainsets to enter certain stations simultaneously, and SEPTA actually treats a couple of its subway stations as “request stops”, with trolleys rolling through non-stop if no one signals to board or alight. 

(I haven’t done the math on this, but it would be worth someone calculating the actual capacity of those two systems compared to heavy rail equivalents. It is true that the TPH levels are higher, but since the trains are shorter, I don’t know that you actually end up carrying more passengers.)

The reality, sadly, is that both of these networks are infamous for their reliability issues. (Full disclosure: I’m much more familiar with the MBTA than SEPTA, but I believe most of the T’s problems also exist in Philadelphia.) Delays are common, both on the branches and then resultantly in the core, potentially resulting in less than forty actual trains per hour through the core. 

Having four or five branches is somewhat workable on these two systems due to their unusual characteristics. Replicating that success elsewhere would likely require replicating those characteristics as well.

The other exceptions that prove the rule: hybrid rapid transit/commuter rail systems

BART’s core trunkline from Daly City to West Oakland feeds out into four eastern branches (Richmond, Antioch, Dublin/Pleasanton, Berryessa/North San Jose). Likewise, the London Undergroud’s Metropolitan Line runs to four termini in the northwestern suburbs (Uxbridge, Amersham, Chesham, Watford). 

Both networks accomplish this by running service to distant suburbs that is more like high-frequency commuter rail than traditional rapid transit service. Each branch on the BART runs every fifteen minutes, which isn’t super unreasonable given that most of those branches travel over thirty miles from downtown San Francisco. (BART is also a pluricentric network, which makes the ridership patterns a bit different than, for example, Chicago’s.)

The Met in London is a bit more complicated, but the concept is similar. Similar to New York, and unlike BART, the Metropolitan is quad-tracked for certain stretches, and therefore runs both local services and express services. During peak hours: 

  • Uxbridge sees 10 tph (6 min) spread across local and express services, with 4 of those trains short-turning at Baker Street
  • Amersham sees 4 tph (15 min), half of which are express
  • Chesham sees 2 tph (30 min)
  • Watford sees 8 tph (7.5 min), again with some short-turns and some expresses

A couple of further notes for context:

  • Almost all of the Uxbridge branch is also served by Piccadilly trains – 12 tph at peak – providing a robust 22 tph, which creates headways under 3 minutes
  • The Amersham and Chesham services run together until Chalfont & Latimer, before splitting off and going one stop each to their terminus, meaning most of the branch in fact sees 6 tph; these services are also supplemented by at least 2 tph that run on Chiltern Railways to Amersham and beyond. 
  • Chesham is also the most distant Underground station – 25 miles from Charing Cross in central London, and technically outside of Greater London – well into territory where 30-minute headways might be reasonable
  • The town of Watford is served by three other stations; the largest of these is Watford Junction, which is less than a mile from the Met station, and sees 4 Overground trains and about 5 London Northwestern Railways trains toward London per hour

So, the Met has a few mitigating factors:

  • Its branches are supplemented by additional services
  • Despite four possible termini, really it just has three branches, one of which splits at the very end
  • The only stations that see 15-minute-or-worse headways are distant suburbs, over 20 miles from the core of London

Like SEPTA and the MBTA, both BART and the Metropolitan also have unusual characteristics that enable them to get away with breaking my “two branches max” rule of thumb.

However, both BART and the Met also have an additional special feature that allow them to have their cake and eat it too… to be continued in the next post

Branches are not your friend

When I was a kid, I wanted to send branches everywhere. As a child, it was an easy concept to understand — I knew that branches came (like the Braintree or Riverside branches) and that branches went away (like Watertown), and if the Green Line used to have five branches, maybe it could have six or seven or eight! And if the Green Line could have eight branches, why couldn’t the Orange Line? 

Obviously, with age has come a modicum of learned wisdom; I stopped drawing branches everywhere and tried to focus on only sending branches where train service actually was reasonable. But there is more to the picture than that.

It is tempting to think of subway branches like roads. If you build a new road, it means that more places are connected. Providence and Hartford don’t have an interstate highway between them — you have to drive north or south first and pick up Route 84 or Route 95, and then head west. It takes longer than it would if there were an interstate directly between them, which is why you will occasionally hear proposals for one. Two disconnected places ought to have a connection between them.

Rail systems don’t work like that most of the time (and actually road systems don’t either, but that’s a different topic).

There actually is a surprising amount to discuss on this topic! Here are some rules of thumb:

Two branches max

For most systems, do not give an HRT/subway line more than 2 branches. A light rail line, or a commuter/regional rail line, can probably take more, but keep in mind the other rules of thumb below.

One evening I decided to jump down this rabbit hole and did a cursory review of pretty much every heavy rail subway system in the world. Almost none had HRT lines with more than 2 branches. Most of the exceptions were themselves exceptional systems, such as BART or London’s Metropolitan Line, both “subway” lines that act more like commuter rail lines, especially along their branches.

Consider frequencies

Branches have low frequencies, trunks have high frequencies. Trunks should only branch once they are far enough from the urban core that lower frequencies will be feasible. 

Most transit systems in North America have a “full-build reach” (even if hypothetical) of a 10 mile radius from the center. Your trunk shouldn’t branch too close to downtown; every city will be different, but in general you’ll want your trunk to branch no closer than 5 miles to the core. If you need to branch closer to the core, you should try to create a second trunk line.  

Remember that branching frequencies are almost always a hard-and-fast math problem: If your trunk line can take x trains per hour max, then two branches can each feed no more than 50% of x. That is often going to be enough to knock a “high-frequency” trunk service into a “mid-frequency tier” on the branches. As such, it’s worth conceptualizing a branch as something less than a “full” rapid transit line.

In the diagram below, note how the trunk line has a high frequency of 4 minute headways via 15 trains per hour, but that splitting it up into three branches very quickly drops frequencies to 12 minutes on each branch.

A service level diagram, where the trunk has 15 tph, and then 5 tph branch off, leaving only 10 tph to the next station, after which the line splits into two branches of 5 tph each

Read more about decreasing branch frequencies in my follow-up post on this topic.

Trunk line capacity should be your starting point

It’s important to recognize that branches are (usually) a game of subtraction, not addition. Your trunk line provides the pool of trains that you can send out to multiple branches. Unless you know that the trunk line is under capacity, you should assume that they are shoveling through as many trains as they possibly can, and can’t add more. So you need to think about redirecting the existing pool of trains, which is why this is a game of subtraction and not addition. 

Note that I said this is usually a subtraction game – some newer/younger rail systems will not be at capacity. When that is the case, a branch proposal can work in your favor: proposing the addition of a second mid-capacity branch can combine with the existing mid-capacity service to create high-capacity service in the core (where presumably demand will be higher). Especially in newer metro systems, there may not be sufficient existing demand to justify the capital expenses of expanding the fleet to increase service in the core; adding a branch can broaden your revenue base, and enable the purchase of enough vehicles to run high-frequencies in the core. (Sometimes – these calculations are always going to be complicated.)

Look for short-turn services (and over-capacity extremities)

Transit agencies are incentivized not to run extraneous services. The further out from the core, the lower the demand for service (very much theoretically, but I digress). One solution agencies use are short-turn services, in which some fraction of vehicles do not run the full-length of the route. Sometimes this is done to reduce the number of near-empty vehicles running on the outskirts of the line, and sometimes this is done in order to increase the reliability of service on the inner sections of the line (and sometimes both). Short-turns are very common on bus routes, but do have their role in rail transit as well. 

If your trunkline has an existing short-turn service, that is a very strong jumping-off point for a new branch: it points to a confirmed high-frequency trunk/mid-frequency branch demand model, and it doesn’t require additional capacity to be freed up in your trunk, since you aren’t trying to funnel a greater number of trains per hour through. (You will still need to expand your fleet size to maintain existing frequencies, although you may be able to adjust frequencies elsewhere in the network to account for the longer trips your short-turn services will now be taking on the branch).

A simple route diagram, from "Downtown" to "Beltway" to "Suburbia", before and after. Before, half of all trains terminate at Beltway (indicated by the line thinning to halfwidth). After, half of all trains go to Suburbia, and the other half divert after Beltway to East Suburbia, on a new branch.

But be careful – this technique works well if the short-turn is intended to avoid excess capacity on the extremities of the existing service. If the short-turn is intended instead to increase reliability within the core, then extending those short-turns out onto a new branch may jeopardize that reliability. And make sure to take note of the pitfalls of junctions, below.

Be cautious with reverse branching

Be cautious with reverse-branching, which is when a transit service splits into multiple branches going in to the city, rather than going out. (SEPTA’s Broad-Ridge Spur is a good example of this on-paper. In practice, it’s actually a little more complicated, but that’s a post for another time.)

A SEPTA system map with the Broad-Ridge Spur highlighted

http://www.septa.org/maps/system/

Recall what we went through above: branches are lower frequency than trunks. Reverse-branching into an urban core thus means you are reducing frequency precisely in the area you need it most. 

Note that I say “be cautious,” not “avoid.” I think that one of the major values of crayon maps is that they sometimes value creativity over feasibility. Reverse-branching is usually more creative than it is feasible, but sometimes it sparks good follow-up ideas. So, I wouldn’t forbid it as a hard-and-fast rule, but it’s good to be aware of its drawbacks.

Junctions are complicated

Junctions where branches come together will always have one of two drawbacks, so be careful where you put them:

If a level junction is used, then you will have capacity limits and sometimes delays, as trains need to wait for each other to cross, and may need to leave a whole signal block free (i.e. the train may not be able to wait right at the junction like a car at an intersection, but may need to be hundreds or thousands of feet away).

A flying junction avoids those problems and should be the standard for any new rapid transit junction. However, flying junctions are much more expensive, and also take up more space — horizontally and vertically — than level junctions. So, as with all things, it’s a trade-off between cost and quality of service. If you want your proposal to be taken seriously, make sure your proposal is ambitious enough to merit building the flying junction. 

In conclusion, branches are not your friend

Branches are not the friend of the crayon-mapper. They look great on paper but require a lot of careful planning to be done well; when done poorly, they can be actively detrimental to the individual branches and the system overall. If you really want to use them on a subway network:

  1. No more than two branches
  2. Aim to branch at least 5 miles from the core
  3. Look for segments where there already is reduced service (short-turns) or reduced demand for service (lower density)
  4. If both branches demand full-frequency service, then both branches warrant their own trunklines through the core: i.e. they shouldn’t be branches, but should be separate lines

Post-script on LRT, BRT and mainline rail

All of the dynamics I describe here hold true on other modes of service. However, the cost-benefit calculations work out a little differently because there are different standards for these modes.

LRT

For the most part, LRT is going to have the same struggles as an HRT subway would. The main differences are all knock-on effects of light rail’s shorter and more nimble rolling stock. Shorter trains makes it easier to “fudge” capacity in a trunk line, with multiple trains stopping in a single station at once, and shorter signal blocks allowing trains to run closer together. The shorter signal blocks also mean that flat junctions – while still disruptive – can be mildly less problematic. 

LRT also – by virtue of its lower capacity – is sometimes a better fit for serving lower-density regions, which can sometimes mean that the frequency cost of more than two branches is more manageable, especially if combined with a higher frequency on the trunk than you could achieve with larger trains.

Boston and Philadelphia both run a scheduled 40 light rail trains per hour through their tunnels (Philly apparently swings even more than that), with four and five branches respectively. San Francisco runs at a lower frequency (I think) in the Muni Metro subway, also with five branches. All three of these systems are plagued with reliability and other issues. (Muni recently tried to redirect two of its branches out of the subway, but now has returned them to the tunnel). That isn’t to say that these systems can’t be improved, nor am I denying benefits to their approaches. But it’s probably best to think of these as the exceptions which prove the rules.

BRT

BRT comes in lots of flavors, some of which are more amenable to branches than others. Christof Spieler gave an excellent presentation at TransitCon 2022 on the varieties of BRT, and discussed some of the pros and cons of branching on each. In short, I’d say that the more you want your BRT line to act like a subway line, the more you should follow the same rules about branching. 

Mainline rail

Mainline rail faces all of the same dynamics I outlined above. The major difference is that the costs of branching don’t always end up being “disqualifying.” If you take a 20tph rapid transit line and give it 10 branches, each branch will get 30 minute headways, which no longer is “rapid transit.” But if you give a 20tph commuter rail line 10 branches, the 30-minute headways on each branch may be perfectly reasonable. The same dynamic is at play — it’s just that the requirements are different and therefore the costs are more acceptable. 

On the other hand, some dynamics remain equally if not more problematic. Junctions, for example, will still be disruptive if built flat and costly if built flying. And reverse branching’s impact may be felt even more acutely: many American commuter rail lines run once per hour; split those between two downtown terminals – we’ll call them “Northtown” and “Southtown” –, and commuters now have to wait two hours between trains, which reduces flexibility for riders and may have an overall chilling effect on ridership on both branches. 

Consider this fictional system below:

Inspired by the NJ Transit system, four routes of 2 tph each branch out to Burlington (green), Louisburg (red), Toledo (blue), and Millville (purple). Those last two merge at Arroyo, proceding north to Belleview where they are joined by Red, all three of which proceed to Newtown where they are joined by Green. Between Newtown and Riveredge are 8 tph. East of Riveredge, each line splits into two half-width thinner lines, one each to Northtown and to Southtown

At first glance, it looks like a relatively robust commuter rail network. Each suburb sees 30-minute headways, and that segment between Newtown and Riveredge sees rapid transit-frequencies of 7.5 minutes. And every community sees direct service to both Northtown and Southtown.

But most commuters don’t care about going to two different workplaces – their destination is the same everyday. Let’s look at what the network looks like for a Northtown commuter:

A modified version of the map above, showing only services that go to Northtown. Each line is now half-width all the way through.

This paints a significantly different picture. Most suburbs are reduced to hourly service, and the turn-up-and-go frequencies at Newtown are gone. 

(To be fair, in this example, most American cities would be thrilled to see commuter rail service at this level – hourly commuter rail is nothing to sneeze at. But I’m keeping the numbers simple to keep the math simple; if most cities start with hourly commuter rail, then reverse branching drops the effective frequency of each branch down to every two hours, which is pretty rough. You get the idea.)

Instead of a robust trunk-and-branch network, reverse-branching reduces this network into two significantly diluted networks operating in parallel. 

The same map as above, but for Southtown, shown at 50% size to compare to the Northtown map at right.
The same Northtown map as above, shown at 50% size to compare to the Southtown map at right.

Extending the T’s Blue Line west: In favor of a Kenmore alignment

I believe extending the Blue Line from Charles/MGH to Kenmore via a Riverbank subway along Storrow Memorial Drive is the stronger “first phase” extension.

The truth of the matter is that we don’t have enough data to say which is better. As I’ve outlined above, almost any extension of the Blue Line west will be treading new ground, bringing rail transit to corridors that have never seen it before. This is virtually unprecedented in the history of Boston transit, so we are in uncharted waters.

Any construction at Charles/MGH should be done to leave open as many possibilities for future extension, including both to Kendall and Kenmore if possible; if a choice must be made, my preference is for Kenmore.

I have are four overarching reasons:

Complementing the Green Line

As outlined previously, the Blue Line and the Green Line have a long historical relationship of interdependence and interweaving. The Kenmore alignment maintains that relationship, and provides relief for the Green Line, freeing it up to adapt to the flexibility offered by LRT without needing to bear the burden of being a pseudo-HRT subway line. 

The Riverbank alignment sends the Blue Line straight down the middle of the gap between Red and Orange, landing it at Kenmore – the major bus transfer hub between Central and Ruggles. This is where the Green Line’s burden would be relieved: it would no longer need to serve as the radial link between the Kenmore hub and downtown.

I have a large and expansive vision for the future of the Green Line, and many more options are opened up through the Kenmore alignment than the Kendall alignment. 

Filling a gap in the HRT network 

We often think of the MBTA as having 4 subway lines, plus a handful of BRT lines. Strictly speaking, that is not quite true. The MBTA has 3 heavy rail lines, a handful of light rail lines, and a handful of BRT lines. The T uses layered LRT and BRT services as stand-ins for HRT services in the Boylston Street Subway, the Tremont Street Subway, and the Piers Transitway, because the ridership along those corridors demands it, but they still are different beasts. 

The future of expanded rail service in Boston lies in LRT and in frequent regional rail. These services are easier to create because they are either easier to construct or are better able to leverage existing infrastructure. With a small number of exceptions (Lynn, Arlington, Mattapan, and West Roxbury), bringing rail service to new locations will be much easier to do with LRT and regional rail (Needham, Watertown, Jamaica Plain, Waltham, Lexington, Grand Junction, Everett, Chelsea, and Dorchester). 

Heavy rail rapid transit provides best-in-class service, there is no denying it. But it also requires the most up-front expense, and is rapidly becoming a form of boutique construction – a Blue Line extension will be usable by Blue Line trains alone, while new stations and improved tracks along the Worcester Line will be usable by metro Indigo Line services, local Framingham services, and expresses to Worcester (and will benefit Amtrak service to Springfield and beyond). Heavy rail expansion therefore must meet a higher threshold of viability and benefit.

As such, I think we need to reconceptualize our idea of Boston’s rapid transit system into three tiers: light metro, heavy metro, and regional metro.

  • Light metro: LRT and BRT services, with smaller vehicles and smaller infrastructure footprints, particularly useful for suburban radial service and urban circumferential service 
  • Heavy metro: your standard HRT, as well as rapid-transit-frequency mainline rail, and Los Angeles-style light rail (e.g. longer trains, high-level boarding, dedicated ROWs). 
  • Regional metro: reimagined commuter rail – 15-minute headways, limited stops within 128, service to suburbs and satellite cities.

These tiers are obviously interconnected, but do form distinct networks. And I believe we need to view them as such. As can be seen here, any Blue Line West extension will serve to fill in the large gap between the Red Line and the Orange Line.

A map of the MBTA's current rapid transit system, showing only the Red, Orange, and Blue Lines. A sizable gap between the Orange and Red Lines to the west of Boston is plainly visible, stretching all the way to Route 128

When we exclude light metro services from the map, the gap in the heavy metro network becomes clear. The streetcar services that run into Kenmore from Beacon and Commonwealth will always prevent that stretch of the Green Line from becoming proper heavy metro, which means an alternative is sorely needed to fill in the gap.

As mentioned above, the future of rail expansion is in LRT, not HRT. Wholesale greenfield rail construction in Boston will mostly be LRT going forward. HRT expansions should therefore be sparing, and strategic, benefiting the entire network as a whole as opposed to specific corridors. Extension to Kenmore balances the heavy metro network overall, and frees up capacity on the Green Line to expand the light metro network into new areas across Greater Boston.

Put heavy metro service to its unique purpose

Let’s hearken back to the days of the El. You live on West Dedham Street in the South End, halfway between Shawmut and Tremont, a block and a half from Washington Street – you can see the El from your front door. A generation goes by, and the Orange Line is relocated out of sight, a bit less than a half mile away in the Southwest Corridor. On the balance, you’re pretty happy – the El was loud, rumbly, an eyesore, a relic of an age past.

But isn’t the loss of transit access a downside? (You are asked by your railfan friend.) Not really, you reply. Even though the El was a three minute walk away, it was nearly 10 minutes to the nearest stations, at Dover or Northampton. The El rumbled by your block every day, speeding through without making a stop. The new station at Back Bay is just as long of a walk, but now Washington Street is sunny and quiet(er). On the balance, you’re pretty happy.

A map of the MBTA rapid transit system in the South End, circa 1980
Before: about a 10 minute walk to either Dover or Northampton
A map of the current MBTA rapid transit system in the South End
After: about a 10 minute walk to Back Bay

(At various points through the 20th century, you might not have walked to the El at all, but instead caught a streetcar or bus at surface level and rode that in.)

The same was true in Charlestown: for nearly three-quarters of a mile along Main Street, the El expressed through, while local residents took the 92. Sullivan, with its massive hub of transfers from Everett, Malden, Medford, and Somerville, was the objective, not the northern half of Charlestown itself. Main Street suffered the drawbacks of rail infrastructure, and for the most part got none of the benefits.

To be clear, I am not claiming that the Orange Line Relocation Projects were net improvements for transit access; the sad story of Equal or Better makes clear that there were drastic downsides that persist to this day. My point is that the Relocation Projects demonstrate that the purpose of the early rapid transit lines was not to serve the neighborhoods they passed through, but to offer a bypass to enable faster journeys to downtown.

The primary role of heavy rail in Boston has historically been to whisk riders in to downtown from the Inner Belt regions and beyond. This is why the Red Line has such lengthy distance between stops in Cambridge, and why the extension beyond South Station headed down along Dorchester Ave instead of heading into Southie: the whole point was to express in to downtown. 

Prior to the Orange Line relocation, the “Inner Belt” transfer hubs – with the exception of Kenmore – were at most two stops away from downtown: Dudley-Northampton-Dover-Essex, Kendall-Charles-Park, Sullivan-Community College-North Station, Maverick-Aquarium-State, Columbia-Andrew-Broadway-South Station. All those intermediate stops were themselves major transfer points or at major destinations. The whole point was to speed the journey downtown from the outer parts of the city, whence a bus or streetcar journey would be painfully long. 

A Blue Line extension to Kenmore fills that gap, and provides the western feeder services (the B, the C, the 57, the 60) with a proper heavy metro express link into downtown, providing a speedy and reliable transfer consistent with similar hubs across the system. This need exists at Kenmore, but does not exist on the other side of the river.

Follow existing ROWs and generally have easier construction

To my knowledge, with three exceptions, all expansion of Boston rail infrastructure in the last 100 years has occurred on alignments and ROWs which were carved out by railroads in the 19th century. (The three exceptions are Harvard-Davis, the stretch between Chinatown and the portal east of Back Bay, and the Huntington Ave Subway.) The Blue-Red Connector would mark the fourth such exception. 

It is incredibly difficult to build rail where none existed before, and it is incredibly rare. The Huntington Subway was decades in planning, Harvard-Davis was built under exceptionally favorable political circumstances, and the Orange Line connection was the lynchpin in a massive service relocation that had been in the works since the 1900s. Virtually no current expansion proposals – official or amateur – call for laying rails where none have been laid before. (The North-South Rail Link is the exception that proves the rule in this case.)

Blue Line West proposals are the only ones where we consistently see greenfield ROWs being proposed. For the Phase 1 alignments I discussed before, this is a necessity – there simply is no way to continue west from Charles/MGH without building new ROWs. Several of the Phase 2 alignments, however, do leverage existing ROWs.

The “Phase 2” alignments I discussed earlier fall into three categories: Watertown, Mass Pike, and Longwood. Kenmore offers access via existing ROWs to all three, due to its location at the confluence of the Highland Branch and the B&A (Worcester Line) ROWs. (Watertown would be the trickiest of the three, but still could utilize the B&A ROW for at least half of the journey.) 

The Kendall alignments are more of a mixed bag. Longwood technically could be accessed from the BU Bridge via a subway under Amory Street, but at significant expense and with some tricky track geometry (i.e. sharp turns). Watertown and the Mass Pike could be reached via Kendall, the Grand Junction, and the BU Bridge, largely utilizing extant ROWs, but at the cost of two river crossings and the lack of access to the Kenmore transfer hub. (Circumferential service from a Kenmore hub to Longwood, Ruggles, and Nubian would be pretty easy to plan with BRT. Relocating the transfer hub to a Blue Line station at BU Bridge would be more difficult.)

One hundred years ago, the mainline gateway to Boston’s western suburbs was located in the Fenway at Brookline Junction station. Despite all that has happened in the intervening century, the ROWs that were laid out feeding into that junction have persisted over all these years. Because of that, Kenmore has remained a transit nexus, and remains the strongest “launchpoint” for any future expansion to the west.

Conclusion

Basically this all boils down to “serving Kenmore” vs “serving Kendall”. Both alignments can land you in Beacon Yard, setting the stage for service to Auburndale, Watertown, or Waltham. Both alignments could (at moderate-to-significant expense) lead to service to Longwood. 

Kendall is a massive employment center, growing every year. Kenmore is a massive transfer hub that will only become more important as the T improves circumferential service. Kendall’s Red Line service is at capacity; Kenmore’s Green Line service is at capacity.

To a certain extent, I’m sufficiently convinced in favor of the Kenmore alignment by the added cost and expense of the dual river crossings needed for any Kendall alignment. Greenfield HRT is going to be hard enough on its own – at the very least, let’s choose the easier option.

But beyond that, I think the Kenmore alignment is simply better for the whole network overall. The Kendall alignments would benefit their immediate corridors, while a Kenmore alignment’s effect would be felt system-wide. 

  • Consolidating Kenmore as a transfer hub makes it easier to build a flexible Urban Ring, in stages if needed. 
  • Complementing the Green Line frees up resources to be redirected into a semi-heavy metro corridor along Huntington, and creates more flexibility for short-turning LRT services at Kenmore. 
  • Focusing construction efforts along the Grand Junction on LRT rather than HRT creates a potentially unbroken LRT corridor from Allston to Cambridge to Sullivan to Chelsea to the Airport. 
  • And a Phase 1 extension to Kenmore leaves open the most possibilities for Phase 2 extensions without the need for massive tunneling projects.

All of this is many years, if not decades, in the future. For now, I reiterate my original point: Any construction at Charles/MGH should be done to leave open as many possibilities for future extension, including both to Kendall and Kenmore if possible; if a choice must be made, Kenmore is the stronger option.

Extending the T’s Blue Line west: Second phases – Reaching toward 128

One peculiarity of this whole situation is that most of the options for “Phase 2” are available from both the Riverbank alignment and the Kendall alignment. They aren’t fully interchangeable, but there is a surprising amount of overlap, and most of them can be discussed largely independently of which Phase 1 alignment is used to reach them.

Blue to Auburndale (and Riverside)

Another proposal from 1945’s yesteryear is extending HRT rapid transit along the Boston & Albany (Worcester Commuter Rail) line to Newton Corner, Auburndale, and then hooking around to Riverside. At the other end, it would have been connected to the Tremont Street Subway via the Pleasant Street Portal. This was a great idea. 

The modern incarnation would see the Blue Line taking the most direct route from its Phase 1 terminus and then running out west parallel to the Worcester Line tracks.

Unfortunately, the 1945 proposal was made before the construction of the Mass Pike east of 128. For those who don’t know, this part of the Mass Pike was constructed by taking land previously occupied by railroad tracks; this stretch once had four or more tracks, like the Southwest Corridor did at the time. The vision would’ve been quite similar to today’s Southwest Corridor: take a couple of tracks and devote them to rapid transit, and leave the rest for mainline rail.

Now with only two tracks, it’ll be much harder to enact that vision. If you wanted to be bold, you could propose reclaiming land from the Mass Pike, but good luck with that; likewise to building a cut-and-cover subway, or an elevated.

In today’s climate, this stretch is much more favorable to an Indigo Line-style service, with perhaps 4 local trains per hour making all stops to Riverside supplemented by 2 trains an hour that run on to Framingham (with 2 additional trains expressing through on the journey to Worcester). This would provide modest frequencies while maintaining a single mode of service. (And, for what it’s worth, would still leave the door open to building a subway or reclaiming some of the Pike later — the capital improvements to support Indigo service would still benefit continued mainline use, even after the construction of HRT extension.)

A services diagram showing a "Transit Layer Cake on the Boston & Albany," where each line represents one train per hour. 4 tph run from Back Bay to Riverside, making all stops, 2 tph run to Framingham, stopping at Lansdowne, West Station, Newton Corner, and Auburndale, and 2 tph run express to Worcester or are Amtrak, stopping at Lansdowne, with 1 tph also stopping at West Station. Stations include transfer indicators: Back Bay (Orange, Green, Teal), Lansdowne (Blue, Emerald, Gold), West Station (Emerald, Gold), Boston Landing, Newton Corner (Teal, Emerald), Newtonville, West Newton, Auburndale, and Riverside (Green, Teal)
This is an example of what a “layer cake” of services on the Boston & Albany might look like, though these service patterns are purely conceptual (or put more bluntly, I just made them up as an example). In this example, I’ve made the Framingham trains run semi-express, but I think it’s hardly vital; I’ve also suggested that 2 slots per hour would be reserved for express trains to Worcester, with the assumption that Amtrak intercity service to Springfield would occupy one or two of those slots in each peak period — again, purely arbitrary. The connection colors are also somewhat conceptual, though they do point to where transfer hubs would be: Newton Corner would become a bus hub, displacing some feeder routes from Watertown Square; West Station would likely offer transfers to some sort of circumferential service; and Lansdowne would offer a walking transfer to the Kenmore hub.

Blue to Riverside (and Needham)

This is probably the most important one to discuss. Extending the Blue Line to Riverside (usually via Kenmore, though occasionally via Huntington) is frequently proposed by amateur transit planners, and is reflective of the D Line’s unusual nature as a Green Line branch: being a converted railroad line, it has rapid transit stop spacing, akin to the Blue or Orange Lines, unlike the other Green Line branches, which stop every few blocks. If you were going to replace one branch of the Green Line with the Blue Line, there are obvious reasons to pick the D, including the fact that it is (nearly) completely grade-separated. 

There are lots of good reasons why it would make sense to extend the Blue Line to Riverside. Unfortunately, there is one very good reason against doing so, and to understand it, we need to take about two steps back and look at the bigger picture.

Northeast Corridor capacity along the Southwest Corridor

Railroad tracks into downtown are like pipes. They need to be able to feed all of the branches they go out to, and likewise they need to be able to accept all of the trains coming in from each branchline. 

So we need to turn our attention to the mainline tracks on the Southwest Corridor, which ironically is also sometimes called the Northeast Corridor — southwest of downtown Boston, northeast of the rest of the country. There are three mainline tracks running from Forest Hills to Back Bay, which need to serve:

  • Commuter rail to Franklin and beyond
  • Commuter rail to Foxboro
  • Commuter rail to Providence and South County
  • Commuter rail to Stoughton, and eventually Fall River and New Bedford
  • Amtrak to New York and beyond
  • Commuter rail to Needham

As you can see, one of these things is not like the other. The Needham Line is the shortest commuter rail line after the Fairmount Line, it only serves two municipalities, and shares origins with the D Line, both being built from the remnants of some of the region’s oldest railroads. (If you’ve ever wondered why inbound Needham Line trains start their journey by going away from Boston, that’s why.)

You’ll notice that the list above includes some destinations that are future-state, including South Coast Rail, as well as expanded Amtrak service. The NEC is going to need more capacity, and there isn’t room to build more north of Forest Hills. That means diverting trains away. Franklin and Foxboro can be diverted to the Fairmount Line (and leverage existing grade separation to boot), but the longer distances to Providence, South County, Fall River and New Bedford necessitate access to the high-speed non-stop trackage along the NEC. 

Needham should get rapid transit

Moreover, sitting just under 11 miles outside of downtown, Needham clearly sits within “Rapid Transit Land”, along with the likes of Riverside, Braintree, Lynn, and Waltham (despite technically sitting outside of 128). The NEC should be reserved for high(er)-speed regional rail, and the Needham Line should be served by rapid transit. 

For those unfamiliar, converting the Needham Line to rapid transit is usually envisioned by splitting it in two: an extension from Forest Hills to West Roxbury, and an extension from Newton Highlands to Needham. (Once again, everything old is new: these alignments in fact were the paths of the original railroads, when built 150 years ago; Riverside-Newton Highlands and Needham Junction-West Roxbury were cut-offs added in later on.)

A map of the current MBTA rapid transit system, focused on Newton, Brookline, Needham, Jamaica Plain, Roslindale, and West Roxbury. The Orange Line has been extended along the Needham Line ROW to a station just past the VFW Parkway at Millennium Park, with intermediate stops at Roslindale Village, Bellevue, Highland, West Roxbury, and VFW Parkway. A new branch of the Green Line has been added, branching west of Newton Highlands, heading southwest to Newton Upper Falls, New England Business Center, Gould Street, Needham Heights, Needham Center, and Needham Junction. Additional extensions visible include a D-E connector between Brookline Village and Riverway, and Indigo Line service to Riverside via Auburndale

So, the Needham Line needs to be converted to rapid transit, and the Needham section ought to be served by trains coming from Newton Highlands. Extending the Green Line to Needham is a well-known and widely-accepted proposal (at least in terms of its feasibility), and is yet another proposal that dates from the 1945 map. Needham Heights to Needham Junction is a good candidate for LRT — the stop spacing is good, the existing station footprints are conducive to light rail stops, and the surrounding density is on-par for what we might expect, similar to the villages in Newton to the north.

Needham can’t provide the Blue Line what it needs: grade separation

Okay, so what happens if the Blue Line eats the D Line? In that case, we would need to have the Blue Line extend down to Needham too, and that’s where we hit the Big Problem: grade separation.

HRT like the Blue Line basically always needs what we call “full grade separation.” Basically that means “no railroad crossings” — bridges and tunnels only. “Light rail” is “light” in part because its vehicles are light enough that they can (sometimes) stop quickly enough to avoid hitting a pedestrian, and because they could collide with an automobile (potentially) non-lethally. “Heavy rail” fails both of those tests: trains that are longer, heavier, and faster which cannot safely coexist with pedestrians and autos without major safety measures.

If you want to extend the Blue Line, you need to find a way to grade-separate the tracks. Whether going over or going under, that will add enormous cost in terms of both finances and likely in terms of disrupting the built environment of the villages. Those costs will be extremely hard to justify. 

To review…

So, barring major changes to the community, the following things are all true:

  1. The Northeast Corridor will need capacity freed up for expanded service to Providence, the South Coast, and other distant locations
  2. The Needham Commuter Rail Line is the odd one out on the NEC, and the only one that can be feasibly removed from the Commuter Rail system altogether
  3. The Needham Commuter Rail Line therefore needs to be converted to rapid transit
  4. The Needham segment of the Needham Line needs to be converted to LRT specifically
  5. A Needham LRT branch would need to be fed from Newton Highlands
  6. Therefore, Newton Highlands must be served by LRT
  7. Therefore, converting the Riverside Line to Blue Line HRT is not feasible due to foreclosing the possibility of service to Needham, thus limiting vitally-needed capacity on the Northeast Corridor

Blue to Watertown and Waltham

Watertown and Waltham create an interesting quandary. There is a large gap between the Worcester Line and the Fitchburg Line, in which Watertown sits, right next to Waltham – both moderately dense communities and employment centers in their own right. And if you draw a line directly west from Bowdoin station, you almost directly hit Watertown Square and then Brandeis head-on; you only need to shift that line up 7 degrees in order to hit Waltham Central Square. Whether from Kenmore, Kendall, or Central, it seems perfectly reasonable to extend the Blue Line to Watertown Square and then on to Waltham.

The immediate challenge with this is that there has never been a railroad ROW between Watertown and Allston. Complete greenfield subway projects are extremely rare – almost the entire MBTA is built on land where rails were laid or tunnels dug over 100 years ago. To build straight across Allston from Cambridge to Watertown would require a major political and financial investment. If support for such an investment could be marshalled, it would be transformative for the area. But it’s worth considering the alternatives; in my opinion, there are more achievable transit solutions for both communities. 

Watertown

Historically, Watertown had three rail links to Boston: the A Line streetcar, a mainline rail station at Newton Corner, and the Watertown Branch of the Fitchburg Railroad. 

A map of extant and abandoned ROWs in Waltham, Watertown, Cambridge, Newton, and Allston. Today's commuter rail and rapid transit lines are visible, as is an abandoned ROW that branches off the Fitchburg Line west of Porter, heading southwest into Watertown (passing Fresh Pond and Mt Auburn Cemetery on the way), before turning west along Arsenal Street, and then winding a circuitous path roughly parallel to the narrow Charles River from Watertown to the Waltham station on the Fitchburg Line.
openrailwaymap.org

A combination of these services resurrected would be significantly easier to build than a brand-new HRT line, and would offer reasonable service with increased flexibility at much lower cost. The ROW of the Watertown Branch is largely intact, and would be an easy and natural extension of GLX’s Union Square branch; LRT would offer greater flexibility for grade separation and limited street-running, if needed. Newton Corner can be rebuilt and served by frequent electrified regional rail service and feeder bus service. And infrastructure investments along the 57’s corridor can increase reliability of service and lay the groundwork for eventual return of light rail service. 

In this map, service to Watertown is restored from the north via mostly-grade separated LRT line from Porter Square and Union Square, using the recently-abandoned Watertown Branch ROW, connecting to an Indigo Line station at Newton Corner, offering riders a direct trip to downtown via Lechmere, or alternatively a transfer to the Red Line at Porter, or a transfer to the Indigo Line at Newton Corner. A separate LRT line to Newton Corner from the south (a resurrected “A Line”) is included here, but would be optional; in the interim, infrastructure improvements for the 57 would provide alternate enhancements.

It’s also worth comparing ridership on the 70 (between Watertown and Central) and the 71 (between Watertown and Harvard): along the stretches between Watertown and the respective Red Line transfer station, the 71 saw over 1500 boardings compared to the 985 boardings on the 70 (not including boardings from Watertown Square on either, although the 71 performs stronger there as well). The 70 corridor is itself not crying out for rapid transit; its main appeal is its directness, and a frequent regional rail service from Newton Corner will likely be just as fast. It is true that, from Watertown Square itself, a Newton Corner transfer hub will be less convenient; but for any riders coming from outside of Watertown Square, it will just be a matter of riding a couple extra minutes on a feeder service. 

Waltham

Readers of the Wikipedia article on the Watertown Branch will note that it used to run all the way from Watertown Square to Waltham Central Square. Why not run the Blue Line to Watertown via the B&A ROW (with a short hop between Newton Corner and Watertown Square), and then follow the old ROW to Waltham? The problem is that the ROW really isn’t intact west of Watertown Square. Even for LRT, it’s very curvy and crosses streets at odd angles. 

A map of extant and abandoned ROWs in southern Waltham and western Watertown, winding a circuitous path roughly parallel to the narrow Charles River from Watertown to the Waltham station on the Fitchburg Line. There is a three-way Y junction just east of Waltham station.
openrailwaymap.org

Again, for HRT, you would need to grade separate the route, which means subway, elevated, or lots of embankments with short bridges over streets. None of those would be popular in the suburbs, especially when rail has been gone for generations (unlike in East Watertown, where trains ran as recently as the 2010s).

Waltham is also much better served by the Fitchburg ROW – whether by frequent regional rail, an HRT extension of the Red Line from Alewife, an LRT extension of the Green Line from Union Square, or some combination of the above. And if you really wanted a rail connection between Waltham and Watertown, LRT would win out again, as you could look at lane-taking on Route 20 to do protected-street-running – again, not an option with HRT at all.  

Blue to Brookline, Longwood, and points south

I’ve discussed above how an extension of the Blue Line to Riverside via Newton Highlands creates challenges. However, a partial extension could be more viable. Assuming a D-to-E connection is built, allowing D Line trains to run into Huntington Ave, an extended Blue Line could take over the ROW between Kenmore and Brookline Village.

This would require some clever tunneling underneath the Mass Pike to hook into the D branch – currently the D shares tracks with the C on the approach to Kenmore, so you would need to find an alternate route. But aside from that, this would probably be a relatively straightforward extension, as the ROW is already grade-separated. This would also have the significant benefit of providing HRT service to Longwood, a major employment center that is notoriously difficult to serve with transit. 

One downside is that you would lose some operational flexibility on the Green Line. The trade-off would need to be studied to get a clear cost-benefit analysis, but I personally think the trade-off could be a reasonable one. An HRT link between LRT stations at Kenmore and Brookline Village could also provide benefit to a larger LRT network overall, depending on final design.

The other downside is that I think this alignment produces a dead-end. Once at Brookline Village, you can’t continue west, for reasons explained above. You could continue south toward Forest Hills, along South Huntington or the Jamaicaway, but at that point you begin to duplicate Orange Line service, at the expense of a lot of tunneling along an environmentally sensitive stretch of greenspace. 

If you wanted to go for the moonshot, you could abandon the southern half of the ROW, and turn east at Longwood to tunnel directly underneath the LMA, potentially continuing further to Ruggles, Nubian, and points east and/or south – essentially building the southern half of the Urban Ring. This extension would require an enormous capital investment, though would likely also see enormous ridership. 

A map showing the Blue Line replacing the Riverside Line between Kenmore and Brookline Village; dotted lines indicate possible extensions to Nubian via LMA and Ruggles or Roxbury Crossing

In my next and final post on this topic, I will discuss why I believe the Kenmore alignment is the stronger choice, and what I think this choice represents for the system overall.

Extending the T’s Blue Line west: First Phases – Reaching the “Inner Belt”

In this and the following post, I’ll go through the Blue Line West extension proposals that are commonly discussed these days.

Route 128 is well-accepted as the limit of what might be called “Metro Boston”, and typically is the outer limit of most transit proposals, and has been for decades, even before Route 128 was built. It sits 10 miles outside of downtown, which often is the limit of a rapid transit system’s reach, in cities around the world.

There is a much fuzzier “Inner Belt” that encircles what we might call “Greater Downtown”, encompassing not only the Financial District, but also the built-up areas of the Seaport, Back Bay, Longwood, and Kendall. This is definitely not a hard-and-fast delineation, but there is a subtle but noticeable shift in character for both the city and the transit network as you cross through the “inner belt”.

The name “Inner Belt” comes from a thankfully-cancelled proposed interstate highway (the remnants of which can be seen in the Inner Belt District and Inner Belt Road in Somerville). Its approximate path was also used in various plans for the Urban Ring. It sits approximately 3 miles outside of downtown, which is also a very typical location for circumferential rapid transit routes. The Inner Belt is roughly demarcated by a series of major transfer hubs: JFK/UMass, Nubian, Ruggles, Kenmore, Kendall or Central, Lechmere, Sullivan, and Maverick. Most of these are the first major transfer hubs outside of downtown on each route. 

Any expansion of the Blue Line beyond Charles will come in phases, and the first phase will be about carving a path to the Inner Belt. The second phase will be about where to go after that. This post will go through the major “first phase” proposals in common circulation these days.

Blue to Kenmore

The Boylston Street Subway isn’t the only way to reach Kenmore. Once again, everything old is new again, and we find inspiration from an early 20th century proposal:

A 1910 BERy map showing the East Boston Tunnel, Washington Street Tunnel, Cambridge subway (terminating at Park), the Atlantic Ave El, and a proposed "Riverbank Subway", originating at Charlesgate & Beacon St, heading east along the Charles River, then tunneling under Chestnut St in Beacon Hill, before curving over the Cambridge Subway and terminating in a loop at the northern end of Boston Common, integrated into Park Street Station
https://commons.wikimedia.org/wiki/File:1910_map_of_Boston_subway_including_proposed_Riverbank_Subway.jpg

The proposed “Riverbank Subway” would have run from Park Street (upper level) under Chestnut Street to what is now Storrow Drive out to Kenmore. Note that at the time, the Boylston Street Subway did not exist — the Riverbank would’ve been the access point for trolleys from Watertown, Allston, and Brookline. 

The modern incarnation of the Riverbank Subway proposal sees the Blue Line extended to Charles/MGH, down along the Esplanade and picking up Storrow out to Kenmore (with a quick jog over to Beacon after Mass Ave). In my opinion, you could see anywhere from 1 to 3 stations between Kenmore and Charles/MGH — definitely one at Mass Ave, and then perhaps one or two serving the far ends of Beacon Hill and/or Back Bay.

A map of the current MBTA rapid transit system, focused on Back Bay, showing the Blue Line extended to Charles/MGH along the Charles River to Kenmore, with stops at Arlington St (near the Hatch Shell), Exeter St, and Mass Ave

This is my preferred extension for the Blue Line. Kenmore is a major transfer hub and will become all the more so as the Urban Ring concept continues to be quietly implemented. An extension to Kenmore would then also provide relief to the Green Line.

While I believe this route also has the fewest problems of the alternatives, it does still present challenges. A subway under Storrow wouldn’t need to contend with too many utilities, and since it’s landfill there should be fewer 17th-century surprises underneath; however, that same landfill can be tricky to work with and would complicate construction.

Additionally, and I’ll discuss this further in my next post, there isn’t a clear “next step” beyond Kenmore for further extension. It’s not quite a dead-end, but it’s less clear than some of these other proposals would be.

An expansion on the previous map, using dotted lines to show possible extensions south through Longwood on the Riverside Branch, and west to Allston/Brighton via Commonwealth or via the Mass Pike, or north to Harvard Square via Allston.

Blue to Cambridge

Blue-to-Kenmore definitely does not enjoy unanimous support among enthusiasts like myself. The most common alternative is to send the Blue Line over to Cambridge — either directly under the Longfellow, or sometimes at an angle toward Binney Street. Once in Cambridge, there are a number of options. The most common I’ve seen is to turn west after Kendall to serve MIT and Cambridgeport. From there, you might cross back over to Kenmore, or head directly into Allston and beyond. 

To be clear, I think these ideas have merit and should be seriously considered. Challenges to overcome include a subway under the Charles — and in fact in all likelihood, a second subway as well to cross back again –, the landfill around MIT (most of the Grand Junction would be hard to tunnel under, due to the landfill underneath), avoiding redundancy with the Red Line, and lack of a good clear “landing point” at the end (the equivalent of Kenmore, in the example above). Of these, the biggest to me is the need for two subway crossings under the Charles, which to be honest I really have no idea about the feasibility or cost of. 

I also worry a bit about redundancy with the Red Line; Cambridgeport aside, Cambridge generally isn’t underserved by rapid transit, and I do believe there are equity and justice aspects to consider. 

Blue-to-Cambridge alternatives can be distinguished by their subsequent destinations:

Kenmore

A map of the current MBTA rapid transit system, showing Back Bay, Longwood, Brookline, Allston, and Cambridge. The Blue Line is extended to Charles/MGH and then across the river to Kendall/MIT, where it then turns under the Grand Junction, stopping at Mass Ave, and then crossing under the Charles River again to land at Kenmore. Dotted lines mark possible extensions south to Longwood via the Riverside Branch, west to Allston/Brighton via Commonwealth or via the Mass Pike, or north to Harvard Square via Allston.

Crossing back over to Kenmore is tempting, given that Kenmore is and will become more of a “gravitational center” for transfers. But a pair of lengthy river crossings seems hard to justify. If Kenmore is your destination for the extension, I think the Riverbank option makes more sense. 

BU Bridge

A map of the current MBTA rapid transit system, showing Back Bay, Longwood, Brookline, Allston, and Cambridge. The Blue Line is extended to Charles/MGH and then across the river to Kendall/MIT, where it then turns under the Grand Junction, stopping at Mass Ave, continuing on with a stop at Cambridgeport near Amesbury St, and continuing across the BU Bridge. Dotted lines mark possible extensions west to Allston/Brighton via Commonwealth or via the Mass Pike, or north to Harvard Square via Allston.

Carrying on straight to the BU Bridge makes for a more direct route. However, missing Kenmore is a significant loss. Moreover, all future alignments from BU Bridge could be accessed via a Riverbank subway to Kenmore. What you get uniquely from this alignment is HRT service to Cambridgeport. Given that LRT service is much more achievable for Cambridgeport and would likely satisfy the need there effectively, this seems like a less efficient alternative. 

Central

A map of the current MBTA rapid transit system, showing Back Bay, Longwood, Brookline, Allston, and Cambridge. The Blue Line is extended to Charles/MGH and then across the river to Kendall/MIT, doubling the Red Line to Central. Dotted lines mark possible extensions west to Watertown via Western Ave & Arsenal St or Cambridge St, the Mass Pike & N Beacon St, to Newton Corner via Cambridge St & the Mass Pike, or to Allston/Brighton via Cambridge St.

Doubling up to Central Square and then heading west has, on paper, some real strengths. Unlike Kendall, Central is a legitimate feeder bus transfer hub of its own right. From Central, further extensions appear ripe (on paper) to Watertown, Allston, and/or Brighton, following existing higher-ridership bus routes, on near-straightaway alignments.

The strongest argument in favor of an extension to Central Square is the access to Watertown. Access to Watertown via the Mass Pike ROW is shared between the Central Square alignment, the BU Bridge alignment, and the Kenmore alignment, but access via Western Ave & Arsenal St (the route of the 70 bus) is unique to the Central Square alignment.

Doubling up all the way to Harvard yields a similar set of pros and cons as Central does, although Harvard makes it much more difficult to continue on to Allston and Brighton.

Doubling the Red Line

Doubling along the Red Line in general is tempting, as a way to increase capacity. But I think this is a situation where the details of the build have outsized importance. In New York City, 4-track subways are mostly constructed on a single level, with shared platforms between services going in the same direction; if you are heading uptown, you go to the uptown platform and have the benefit of choosing the express vs local service based on which train arrives first.

If you aren’t able to unify services on single platforms, you run into drawbacks very quickly that will severely undercut your hoped-for capacity boost. For example, I’ve seen proposals that place a Blue Line station at Kendall off-set to the north, near the Volpe building. This may be a useful footprint in which to build a station, but it means that the Blue and Red Line platforms will be some distance apart.

Distanced platforms means that riders will need to commit to a line decision very early in the boarding process. This means that agnostic riders — those destined for Charles/MGH, Park, Government Center, State, DTX — will still have to pick a line, even though either one will work for them. They won’t have that New York-style “stand on the platform and grab the first train to arrive” option. Given that Red will eventually have 3-min headways and Blue (as far as I know) will have 5-min, you also won’t see an even split among agnostic riders, as some will prefer the higher-frequency service – the Blue Line will probably get very few agnostic riders, and instead will be only picking up riders who were destined for the Blue Line anyway.

It’s true that doing so would still relieve crowding on the Red Line, but it still is targeting only a particular subset of riders. Additionally, depending on how far the Blue Line doubles (Kendall, Central, Harvard), you’ll still need to contend with riders transferring from the Red Line (e.g. from Davis) to the Blue Line – where will they make the jump from Red to Blue (and therefore where could we expect crowding relief to start)? Charles/MGH looks like it will be very well-designed for easy transfers, so if Charles provides a shorter walk than Kendall does, many riders will continue to stay on the crowded Red Line, even though in theory the Blue is available.

I should also note that doubling up the Red Line would entail significantly more complicated tunneling than other proposals would.

There are other ways to address capacity on the Red Line. Increasing headways will add about 50% additional capacity. Extending the Green Line to Porter will siphon off both downtown and Longwood/Back Bay commuters, looking for a faster and/or one-seat ride to their destination. Providing circumferential service – for example LRT on the Grand Junction, or a Green Line spur to Harvard – will also reduce the number of riders needing to go downtown. Doubling up with the Blue Line is not the only option.

A verdict?

As mentioned above, I believe a first phase extension to Kenmore is the stronger option. I will discuss my reasoning in further detail in the final post in this series. That being said, I firmly believe that both alternatives present benefits and drawbacks, and neither presents a perfect solution.

Both alignments require study. As I laid out in previous posts, we’re in uncharted waters here. No heavy rail service has ever existed along the trajectory we are discussing, making this corridor almost unique among transit expansion proposals in Boston. So I absolutely want to be clear that a firm verdict is both impossible and undesirable at this stage.

What I will state with greater confidence is what options are created and eliminated by each of these alternatives. And what I will go into further depth on is how these alternatives reflect larger systemic choices we need to make as we envision the T’s future in the third millennium. This isn’t just about job growth in Kendall, or passenger transfers at Kenmore: it’s much bigger than that.

In the next post, I’ll talk about where the Blue Line might go after a Phase 1 extension.

Extending the T’s Blue Line west: Ideas of Yestercentury

Introduction

Proposals to extend what would become the MBTA’s Blue Line west of downtown have been floating around for over a hundred years. While most of these ideas have fallen out of the present discourse, they remain worth discussion, as they continue to inform today’s proposals.

Blue Eats Boylston Subway

Last week, I explained a 1926 proposal that would have linked the East Boston Tunnel to the Boylston Street Subway, freeing up the Tremont Street Subway to serve a dedicated line running from Huntington to Lechmere. Let’s quickly run through the challenges with enacting the 1926 proposal today.

A 1926 map of the Boston Elevated Railway system, with extant routes drawn in black, and two new routes highlighted in color: a yellow line, stretching from Maverick to Scollay to Boylston to Kenmore to Commonwealth to Allston, and a pink line, running from Lechmere to Boylston to Back Bay station to Huntington to Brigham Circle
https://commons.wikimedia.org/wiki/File:Map_of_1926_proposal_for_Boston_rapid_transit_lines.png

First, the Green Line now has four branches that fan out across a wide area. It would be impractical to create so many branches of the Blue Line. Even if the E Line were rerouted into the old Pleasant Street Portal, it’s still not feasible to convert the B, C and D Lines all to HRT. The original plan in 1926 was for the Beacon, Commonwealth, and Watertown trolleys to terminate at transfer stations at Kenmore and in Allston, mirroring similar designs in place at Harvard, Forest Hills, Dudley (now Nubian), Sullivan, and others. But in the intervening century, residents in Brookline and Allston have become accustomed to a one-seat ride to downtown, so short-turns with a transfer are much less politically feasible than they once were.

Additionally, there are a large number of corridors throughout Greater Boston that are more appropriate for LRT than HRT. Maintaining the Boylston Street Subway as LRT would provide a core piece of infrastructure for that network, benefitting the system overall. Conversion to HRT would hamper that effort. 

Finally, the turn at Boylston is too sharp for HRT vehicles. So not only would Park Street need major reconstruction to hook in the Blue Line, but Boylston would either need to be rebuilt, or altogether bypassed. At that point, you are basically rebuilding everything between Arlington and Haymarket, as opposed to reusing the existing infrastructure.

Blue to Huntington

This idea and ones similar have floated around for a while, popping up here and there, so it is worth mentioning for completeness. This one runs into the same challenges as the original 1926 proposal, in that you have to dig up the Common and then figure out what to do south of Park Street.

However, a roundabout route via Charles/MGH, Arlington St, and something like Stuart St could potentially be more feasible (as diagrammed below). The construction would be more complicated, and the alignment as the subway turns west past Arlington would be tricky — HRT can’t make the sharp turns that LRT can. Additionally, the roundabout route takes about 1.3 miles to go the ~.75 miles that the crow flies between Arlington and Government Center, which is makes for a substantial diversion.

A map of today's MBTA rapid transit system, focused on Back Bay, Longwood, and Brookline. The Blue Line extends from Bowdoin to Charles/MGH, down Storrow Drive to the north end of Arlington Street, runs along the Public Garden to the Green Line's Arlington station, before vaguely turning west under Stuart St (the diagram is imprecise) until reaching Huntington Avenue, where it continues until the Mission Hill neighborhood. From there, dotted lines show possible further extensions south to Forest Hills, and north to Brookline and then Harvard or Brighton

For those reasons, I see this route as implausible. That being said, if it could be swung, it would be a monster success. The ridership on the E Line is ridiculous, and you’ll notice that even on the 1926 map, they were proposing HRT under Huntington. Longwood is a beast of an employment center, and that’s not even considering the schools and the Pru. 

That being said, I believe that an extended subway under Huntington Avenue, running modern LRT (like Los Angeles’s) can effectively meet the needs of this corridor, and can do so as part of a larger more robust network that would see more one-seat rides into this neighborhood. In that respect, HRT is both unnecessary and would constrain the rest of the system.

[EDIT] Looking again, I noticed that leveraging Columbus Ave between Arlington Street and the Mass Pike could enable you to tunnel from Arlington Station to Back Bay Station using cut-and-cover and keeping the turn radius moderate enough that HRT could probably swing it.

A map of today's MBTA rapid transit system, focused on Back Bay, Longwood, and Brookline. The Blue Line extends from Bowdoin to Charles/MGH, down Storrow Drive to the north end of Arlington Street, runs along the Public Garden to the Green Line's Arlington station, before turning southwest under Columbus Ave, and then turning west next to the Mass Pike, stopping at Back Bay and continuing until reaching Huntington Avenue, where it continues until the Mission Hill neighborhood. From there, dotted lines show possible further extensions south to Forest Hills, and north to Brookline and then Harvard or Brighton

This route would still be pretty roundabout between Back Bay and Government Center. And I still maintain that Huntington is a better fit for an LRT trunk subway. However, it could be more doable than I originally thought.

[END EDIT]

Blue Eats GLX

Once upon a time, when the T and the state were reviewing alternatives for providing service along what is now the Green Line Extension, one idea considered was extending the Blue Line instead. There is some logic here — the GLX corridor probably could merit HRT.

There are some major downsides though. Beyond the obvious — GLX is finally nearing completion and it seems silly to be already talking about ripping it out and replacing with HRT — turning the Blue Line north after Bowdoin would eliminate any possibility of a Red-Blue Connection, which is sorely needed and pretty much must be included in any Blue Line Extension. Realistically, Blue-to-Charles is going to be built before any of these further proposals will ever be seriously considered, so we should assume Charles/MGH as the launching point for all such proposals.

One alternative that could perhaps be feasible on a fifty-year timescale would be to extend the Blue Line to Kendall, and from there turn north to pick up either or both of the GLX branches. Depending on how the Green Line evolves in the next few decades, it may be advantageous to provide some relief to its northwest quadrant.

A map of the current MBTA rapid transit system, focused on eastern Cambridge and Somerville, showing the Blue Line extended from Bowdoin to Charles/MGH, across the Longfellow Bridge to Kendall/MIT, after which it turns north under the Grand Junction, with a stop at Cambridge Street, before meeting the alignment of the present-day GLX Medford Branch, and carrying on from there; a dotted line indicates an optional extension to Union Square and beyond

There are some things I actually like about this idea — there’s a certain symmetry to it that I find aesthetically pleasing, for lack of a better term. There are specific challenges — for example, I think it would be difficult to find a good spot for a Green-Blue transfer station — but unfortunately the biggest challenge is still that it’s way too early to be planning another massive construction project on the GLX corridor.

Fifty or sixty years from now, if GLX trains are packed to the brim, and the Blue Line still terminates at Charles/MGH or Kendall/MIT, then this idea might merit closer consideration.

[EDIT] In conversation with user Brattle Loop on ArchBoston, I realized that a better path from Kendall/MIT to the GLX ROW would be via Inman and Union Squares. This would require significantly more tunneling — cut-and-cover to Inman, and then bored tunnel through Union Square and north to the GLX ROW. However, it would allow for a strong Green/Blue interchange at Union Square, potentially also with circumferential LRT service from Union to Sullivan and beyond. It would also provide a one-seat ride from Union to Kendall — hardly a critical pairing, but still one that is not possible via the Grand Junction. (I have also since been reminded that the Grand Junction is probably less-than-ideal for actual tunneling, given its landfill history. If Blue-Eats-GLX is ever to happen, the Union Square alignment is probably the way to go, though it would be expensive.)

A map of the current MBTA rapid transit system, focused on eastern Cambridge and Somerville, showing the Blue Line extended from Bowdoin to Charles/MGH, across the Longfellow Bridge to Kendall/MIT, after which it turns north under Hampshire Street, to a station at Inman Square, and then to a station at Union Square, before meeting the alignment of the present-day GLX Medford Branch at Gilman Square, and carrying on from there; a dotted Gold Line indicates potential circumferential service to Sullivan from the Grand Junction line and from Porter Square; the Grand Junction branch of the Gold Line has stops at Twin City Plaza, Cambridge St, Binney St, Main St/Kendall, and Mass Ave/MIT

[END EDIT]

Blue Horseshoe

One of the major gaps in the MBTA’s rail network is Chelsea and Everett. Most proposals suggest adding rapid transit along the commuter rail line, running circumferentially between the Orange and Blue Lines. Typically this is suggested as LRT or BRT, and indeed Chelsea (in theory) now sits on the MBTA’s rapid transit network thanks to the efforts at BRT on the SL3 branch; there are also official discussions afoot to extend SL3 to Everett.

I sometimes see folks — especially when working on their first “crayon map” of possible extensions — who propose branching either the Blue Line or the Orange Line to serve this corridor:

A map of the current MBTA subway network, focused on Chelsea and Everett, showing dashed line branches of both the Blue and Orange Lines, originating at Maverick and Sullivan respectively, following the historic ROW of the Grand Junction across the rivers into Chelsea and Everett, paralleling the Eastern Route Commuter Rail line

Neither of these are a “Blue Line West” extension proposal, so I won’t go into detail here, but neither of these branches are likely to ever get built. Right now, the T runs as many Orange Line trains as it can to Wellington and Malden Center, and as many Blue Line trains to Wonderland (and hopefully someday Lynn) as it can. It does this because those are all massive bus transfer nodes with huge ridership. Branching either the Blue or the Orange means that the transfer nodes in question will get half as many trains, and that’s just not feasible.

Every so often, someone rightly points out that we could do a moonshot and build a radial line to Chelsea, particularly if we could somehow integrate it to the Tobin Bridge. Radial service to Chelsea has been occasionally discussed, for over 100 years. See for example page 76 and 77 in the 1910 report of the Boston Transit Commission and  pages 71 through 73 in the 1914 report of the Boston Transit Commission. (Boston in Transit has a scan of the map from the 1914 report.) Vanshnookenraggen also refers to a proposal for an elevated line to Revere via Chelsea and Charlestown on his historic track map, though I haven’t been able to locate the original source for this. (Van, if you see this and can share your source, I’ll update the post!)

One wild idea for a radial line would be to build it from Charles/MGH via Science Park and Charlestown, alongside or possibly on the Tobin Bridge. To my knowledge, the first person to propose something like this was user davem on ArchBoston, though his proposal lacked the horseshoe element, and instead turned Charles/MGH into a traditional diverging point. I think the diverging alignment isn’t a feasible service pattern, so I’ve drawn a horseshoe instead that takes the idea but creates an unbroken line of track from Chelsea to Charles to Maverick. 

Once Chelsea is reached, one could continue on all the way to Lynn, though that would open its own share of complications. One could instead press north into Chelsea, and/or veer over to Everett. The challenge with both of these is that neither has seen rail, so there are no existing ROWs to leverage; the closest equivalent is the Route 1 highway. Rapid transit can built along highways, but it’s not ideal; transit should go close to where people live, and people try to avoid living near highways. A Blue Line extension would likely need to be a subway, with all the complication and cost that entails. 

Plus, there’s still the challenge of getting to Chelsea. The Tobin Bridge aside, how do you get to the Tobin? On paper, it is true that Charles St between Charles/MGH and Science Park is pretty much straight-shot aligned with Route 1 on the other side of the Orange Line, but the challenges become apparent in three dimensions — between Science Park and Route 1 is a spaghetti of highways, ramps, Orange Line subway tracks, commuter rail tracks, a dam, and the Charles River. 

On top of that, as mentioned above, you need to have a Red-Blue connection, and that basically has to be at Charles. Hence the horseshoe: Government Center-Bowdoin-Charles/MGH-Science Park. But even this alignment still leaves you lacking a connection between the Chelsea branch and the Orange Line.

My feeling is that there are more cost-effective solutions to serving Chelsea and the North Shore, and stronger cases for the Blue Line elsewhere.

In the next post, we’ll start to examine proposals that are more frequently discussed in contemporary planning and crayoning. 

Extending the T’s Blue Line west: Historical Background

Introduction

The MBTA’s Blue Line is one that has frequently captured the imagination of amateur transit planners. A proper HRT line like the Red and Orange Lines, but much shorter, and terminating in downtown Boston. Proposals to extend the Blue Line to the northeast to Lynn and beyond have been floating around for most of a century now, and the so-called “BLX” project is one that is alive and well and commonly discussed in the domain of “serious” proposals.

At the other end, there is an active proposal to extend the Blue Line west the short distance to Charles/MGH, to provide a badly needed connection to the Red Line. (This is the rare extension that is entirely missing from BERy’s proposed expansion map from 1945.) Personally, I think this is pretty likely to be built in the next 15 years, and I suspect it will be the next major project that advocates focus on once GLX finally opens.

For amateur transit planners, that terminus at Charles/MGH beckons for extension. “It’s a whole untapped HRT line!”, we say to ourselves. “With its own tunnel through downtown and to the airport to boot! Surely it’s worth extending it… somewhere.”

This post is the first in a series that will examine the different possibilities for extending the Blue Line west from Charles/MGH. Today’s post reviews some historical background that is relevant for this topic. Subsequent posts will review specific proposals, and the benefits and challenges of each. 

Why isn’t there an obvious answer?

The first thing to acknowledge is that there is not an obvious answer for where the Blue Line should go ​​west. Though it may not seem like it, this is actually a big deal. For all other major endpoints, there is general consensus for feasible corridors:

  • Wonderland: northeast to Lynn and beyond
  • Oak Grove: north to Reading 
  • Medford/Tufts: north toward Winchester
  • Union Square: northwest toward Porter and beyond
  • Alewife: northwest toward Arlington and/or west to Waltham
  • Riverside: no further extension, as you’ve already reached Route 128
  • Forest Hills: southwest to Roslindale Village and/or south to Readville
  • Ashmont: convert the Mattapan High Speed Line to HRT
  • Braintree: no further extension (already reached the proverbial Route 128 boundary, even though, yes, it’s technically not Route 128 at that point)

That brings us back to that 1945 map. By and large, these corridors have been identified for a century, and are closely tied to the paths Massachusetts’ original railroads struck out in the 19th century. 

But as you can see, there is no vision for where the Blue Line should go in 1945. 

1945 map by the Boston Elevated Railway company, showing proposed extensions of the rapid transit network, to Lynn, Reading, Woburn, Arlington, Riverside, Needham, Dedham, Milton, and Braintree
https://commons.wikimedia.org/wiki/File:1945_BERy_extensions_map.jpg

Now, to be clear, I am not saying that there’s nowhere for the Blue Line to go simply because transit planners in 1945 had no ideas. But it gives us a clue as to why there isn’t an obvious corridor — and for that, we need to look further back into history.

The Blue Line is half a line — and the Green Line has the other half

A brief refresher: the Tremont Street Subway opened in 1897 between Boylston and Park, enabling the street above to be liberated from the crush of streetcars coming from all over the city. The rest of the subway opened, running from Haymarket to Pleasant Street (south of today’s Boylston station), providing a north-south spine for streetcar service through downtown. In 1906, a tunnel opened between downtown and East Boston — today used by the Blue Line, but originally used by streetcars, providing a east-west complement to the Tremont Street Subway.

In the early 1920s, the East Boston Tunnel was converted to “rapid transit”, as they called it at the time: platforms were raised to high level, streetcar routes were truncated to a transfer station at Maverick, and heavy rail rolling stock — like those used on the Cambridge-Dorchester Subway and the El — replaced the streetcars in the tunnel. BERy was seeking to replicate successful models used at Harvard, Sullivan, Dudley (now Nubian), Forest Hills and others: maintain streetcars as local feeder services into large transfer stations where passengers can be whisked downtown by rapid transit. 

Ideas to unify the Central Subway with a link to East Boston have been around since the subway was first envisioned. You can see on Vanshnookenraggen’s Flickr an early plan to hook the East Boston tunnel (in planning at the time) directly in to the subway, via the loop at Scollay Square. (I can’t remember right now exactly when this particular map dates from, but I believe it’s late 1890s.)

A paper map of the "Plan showing one of the proposed Routes for East Boston Tunnel", where the route extends out of the loop at Scollay Square, continues under Hanover street before cutting east under the Harbor, and arriving in East Boston under Lewis Street
https://www.flickr.com/photos/vanshnookenraggen/346212879/in/album-72157594460286528/

In the early ‘20s, at the same time that the East Boston Tunnel was being converted to Rapid Transit, efforts were underfoot to do the same on what would become the Green Line. Those efforts are worth a post of their own, but suffice it to say that plans were grand.

One such plan — dating from 1926 — is illustrative for our present question. In addition to converting both the proto-Blue Line and proto-Green Line to full HRT rapid transit, this proposal also called for hooking the East Boston Tunnel into the Central Subway by way of Park Street, and then take over the subway to Kenmore and beyond. (You can view the original high-res map on Wikimedia Commons.)

https://commons.wikimedia.org/wiki/File:Map_of_1926_proposal_for_Boston_rapid_transit_lines.png

As you can see, this proposal breaks the Green Line in half, and gives half of it to the Blue Line. And let’s be clear: then and now, the corridor from Longwood to Huntington to Back Bay to downtown to Lechmere absolutely merits a rapid transit line of its own. The Green Line of today pulls double duty, covering the role of at least two rapid transit lines, if not more. 

Broadly heading west from downtown, there are three broad corridors, each meriting rapid transit: Boylston Street, Huntington Ave/Southwest Corridor, and Washington Street. The 1926 proposal lines up the proto-versions of the Blue, Green, and Orange Lines, and launches them out to those three corridors, one by one. 

This proposal, had it come to fruition, would have created a very balanced network, with relatively evenly spaced “spokes” radiating out from downtown, and each major corridor covered.

So, as seen here, it is possible to design a Boston subway system with 4 “full” lines, each with fully developed “legs” running into downtown. Today’s network — 2 full lines (Red and Orange), 1 half line (Blue), and 1 half-ish line (Green, at least until GLX opens) — is not an inevitability. 

Since the 1926 plans never came to fruition, we instead had the Blue Line and Green Line each running into downtown and basically terminating there. The 1926 plans illustrate how reasonable it would have been to consolidate the existing Blue Line and existing Green Line into a single line, and thus illustrate how the Green Line has essentially been acting like the second half of the Blue Line.

(Imagine if the Red Line were two lines: A Crimson Line running from Cambridge to South Station, and a Purple Line running from Post Office Square to South Station to Andrew and beyond. Both lines terminate downtown in this example, but very logically could be stitched together, forming a natural corridor through the core. I’m arguing that the same is true of the Green and Blue Lines: just as the hypothetical Crimson and Purple Lines combine to make the Red Line, the Green and Blue functionally combine to create a single corridor through the core.)

The Green Line has taken over what would have been the logical western half of a full-build crosstown Blue Line. This is why there is no obvious “next step” beyond Charles/MGH: the Green Line has been taking care of the East Boston Tunnel’s western counterpart all this time.

Why can’t 2026 be like 1926?

By which I mean, why can’t we take the 1926 proposal and use it today? There are quite a few reasons, and many of them overlap with other challenges for crayoning the Blue Line west, which I’ll describe in subsequent posts.

The first and most immediate reason is that the 1926 proposal called for a tunnel under the Boston Common to connect then-Scollay Square Station with Park Street Station so that the “Blue Line” could hook into the Tremont Street Subway and Boylston Street Subway. While I wouldn’t want to say that a new tunnel under the Boston Common will never happen, it’s extremely unlikely. Moreover, hooking a new subway into Park Street would almost certainly require massive modifications to the existing station.

The larger reason, which is illustrative of the general challenges of planning a westward extension of the modern Blue Line, is that the Green Line is no longer the vaguely mirror image of the East Boston Tunnel it once was. The Green Line has become an entire subnetwork of its own, with potential for radical expansion, and a century’s worth of inertia behind the current design. It has grown beyond what it was in 1926, and can’t be quite so easily replaced.

In the next posts, we’ll go through different proposals from past and present, examining the benefits and challenges for each.